RAMCO has always led the way in OCTG care and maintenance, including working with several UK and Norwegian operators to introduce yard preparation of tubulars prior to ‘rig ready’ delivery. So, what exactly does “Rig Ready” mean?
Innovators in Pipe Care Excellence – The Rig Ready Approach
In 2002, when the average price of Brent Crude was below $30/bbl, RAMCO working in collaboration with several key operators in the oil and gas industry introduced the rig ready concept. This service set a new benchmark in offering clients their tubulars in a ready to run state at the rig site, removing costly and time-consuming preparation time at the rig.
The Challenge
At the time, the industry demanded improvements in operations offshore in respect to environmental, safety, quality and operational aspects of tubular management, it was identified that costly time was being used in preparing pipe to run at the rig. If the pipe could be delivered ‘ready to run’ this would bring added benefits, though this had some challenges, not least in ensuring product quality, rig site acceptance and changing a mindset – one that believed the only way to safely run pipe was to prepare at rig site.
Our Solution
Working with several operators, we developed a robust system that ensured product quality, provided confidence in the final product and tackled the management of change. Liaising with key service providers, the cradle to grave cycle of tubular management was redesigned and led the way in what has become a global standard for offshore operations.
Key Benefits
There are a number of key benefits to the providing rig ready materials.